Topic > Hod Statement for Installing Floor Tiles (Ceramic, Porcelain and Agglomerate)

Equipment needed: Say no to plagiarism. Get a tailor-made essay on "Why Violent Video Games Shouldn't Be Banned"? Get an original essay Drum Mixer Grinder Aluminum Straight Edge Trowel Plumb Level Wheelbarrow Hand Shovel Water Tank Right Angel Spring Hammer Delivery, Storage and Handling of Materials: Only materials that approved will be used as part of the execution of the works of tiling. The handling, delivery and storage of tiles, adhesives and cementitious/grouting materials will be maintained in a compliant manner to ensure no discolouration and damage occurs. Tile shipments must remain stacked in groups together with respect to type, color, shape, thickness and shape. Tiles from different batches will not be mixed into one batch. It is intended to ensure coordination, inspection and preparatory work. The provision of floor drains, where applicable, will be guaranteed according to the approved working drawings. The ground work to obtain the tiles will be examined before the repair and installation of the tile works begins and any discrepancies relating to accuracy and suitability for the location which may adversely affect the installation and permanence of the works , if found, will be reported to the consultant. Before installing the tiles, it will be ensured that the relative layout and working drawings are approved by the consultant. Provide symmetry to the center lines of the area and adjust to reduce tile shear. Tiling must start from the starting point set in the approved executive drawing. Arrange your tile work so that you don't end up with tiles that aren't exactly half the full size and with minimal cutting. Carefully sand the edges of the cut tile. Make sure the cut tiles are in the corners and are equal on each dividing side. It will be ensured that there are no undesirable color or shade variations within the tiles to be used as part of each area according to approved measurements and relevant approved material approval requests. Model Construction Models for each type in the Consultant's distinct area will be installed for the Consultant's approval, before starting the development of the actual works accordingly. The actual works will be completed according to the template approved by the consultant. The approved model may remain as a component of the finished works. Preparing the flooring substrate Please note: this is just an example. Get a custom paper from our expert writers now. Get a Custom Essay The concrete substrate cast in place must be adequately smooth and level such that when a thin mortar is applied to accept the tiles. Eliminate high spots and fill low spots as important to ensure no voids occur. In all toilets and pantries where waterproofing is to be carried out, apply the waterproofing after laying the tiles following the details as shown on the relevant approved drawings. Tile Arrangement and Installation Thoroughly mix bedding or adhesive materials as approved to achieve uniform consistency with proper forcing action per manufacturer's suggestions. For the installation of ceramic, porcelain stoneware and agglomerate tiles as required by the approved working drawings or the finishing program. Only approved tile adhesive or grouts will be bonded to the substrate and backing of the tiles per the manufacturer's recommendations..